Find your energy solution

Search by product model, brand or keyword.

EITAI / SOLIS CONNECTION

EITAI LV batteries with Solis: communication and setup records.

Find the low-voltage connection guide, the relevant battery manual and the information to prepare before commissioning.

What does the EITAI–Solis connection reference establish?

It documents the low-voltage communication pin table, battery address settings, BMS-to-CAN connection and inverter setting screens. Start from this documented arrangement, then confirm the complete Solis model and battery version.

Scope and checks

This source is a low-voltage setup reference. It does not name every Solis model or establish a high-voltage pairing. A CAN socket alone is not proof of supported communication.

What the connection guide contains

The three-page EITAI–Solis guide includes a battery/inverter communication pin table, battery address-switch guidance, the BMS-to-CAN connection and inverter menu screens. It is a connection reference for the documented low-voltage setup; it does not establish support for every Solis range or battery firmware.

Confirm the battery side as well

Identify the battery model and BMS before choosing the cable and protocol. For multiple batteries, confirm the documented addressing arrangement and the required link connections. The battery user manual and the inverter manual remain separate parts of the installation information.

Request the model-specific configuration

Share the complete Solis model, battery model, quantity and firmware with EITAI. A clear equipment list helps the team review the correct document and any version differences. Keep the agreed settings with the project handover information so the next installer can identify the actual system.

FAQ

Is the same communication cable suitable for every Solis system?

Confirm the pin assignment and protocol for the exact battery and inverter. A matching plug alone does not establish compatibility.

Read the compatibility checklist

Start with the exact model.

Send your equipment list, installation country and document requirements.

Ask EITAI