Deye
17s · EDITED FOOTAGEHV pairing footage
Selected factory footage of the battery group, BMS and inverter displays. This is separate from the LV WALV-10K / ELECUBE-5K list above.
EITAI / COMPATIBILITY & VERIFICATION
For installers, distributors and EPC buyers: review EITAI entries in manufacturer lists, then check the equipment and versions for your project.
Find a documented combination↓Applies to the models and versions shown. Confirm your exact equipment and project configuration.

Original model labels and version conditions retained.
01 / MANUFACTURER RECORDS
Only EITAI-related entries are presented here. Each record keeps its source revision, original date and applicable conditions.
| EITAI battery / source label | Inverter scope | Protocol | Version / condition |
|---|---|---|---|
| ET-51.2v 100ah-HV | WIT 29.9-50K-XHU / WIT 50-100K-HU | CAN | T2.0.0 · p4 |
| ET-51.2v 200ah-HV | WIT 29.9-50K-XHU / WIT 50-100K-HU | CAN | T9.0.0 · p4 |
| ET-51.2v314ah-HV | WIT 29.9-50K-XHU / WIT 50-100K-HU | CAN | T6.0.0 · p4 |
| ET-76.8v 314ah-HV | WIT 29.9-50K-XHU / WIT 50-100K-HU | CAN | T3.0.0 · p4 |
| ET-ELEMAGIC10.2-HV | WIT 29.9-50K-XHU / WIT 50-100K-HU | CAN | W7.F · p4 |
| ET-51.2v 314ah-HV | WIT 29.9-50K-XHU / WIT 50-100K-HU | CAN | T 3.0.0 · p3 |
The source spells the brand “EITAI” on page 4 and “EiTai” on page 3. The 314Ah entries carry different software versions. They remain separate records here; confirm the actual BMS/hardware configuration and approved version before selection.
EITAI-prepared extracts from the supplied original. Other battery-brand rows are omitted; the summary retains the source scope and conditions.


| EITAI battery / source label | Inverter scope | Protocol | Version / condition |
|---|---|---|---|
| WALV-10K | See inverter series below | CAN | Setup 00 |
| ELECUBE-5K | See inverter series below | CAN | Setup 00 |
This dated list names WALV-10K / ELECUBE-5K and the inverter series shown here. It does not establish compatibility for other EITAI models. Confirm the supplied equipment and current requirements before installation.
EITAI-prepared extracts from the supplied original. Other battery-brand rows are omitted; the summary retains the source scope and conditions.

| EITAI battery / source label | Inverter scope | Protocol | Version / condition |
|---|---|---|---|
| LV Lithium batteries | S6-EH1P(3-6)K-L-PRO | Not stated in list | HMI V06-10 |
The source uses the broad label “LV Lithium batteries”, rather than individual EITAI model codes. HMI V06-10 is taken from the original merged version cell. Confirm the exact battery, firmware and market requirements; this is a dated compatibility record.
EITAI-prepared extracts from the supplied original. Other battery-brand rows are omitted; the summary retains the source scope and conditions.

These are dated compatibility records, not blanket certification, an exclusive partnership claim, or a guarantee for every system configuration. Full source documents are retained for verification.
02 / ENGINEERING CHECKS
Before shipment, EITAI engineers test the battery with the corresponding inverter and arrange dispatch after the pairing test passes.
走进工程测试现场
工厂联机实拍节选,无声播放。完整型号、固件及测试结论需结合对应工程记录核对。
Selected factory footage of the battery group, BMS and inverter displays. This is separate from the LV WALV-10K / ELECUBE-5K list above.
Equipment and running displays from a high-voltage setup. Match the complete equipment and firmware to the engineering record.
A high-voltage setup, separate from the S6-EH1P(3-6)K-L-PRO low-voltage list above.
Low-voltage inverter and battery displays. This is not the C&I WIT high-voltage combination listed above.
A separate setup shown in the supplied footage. Exact model, firmware and tested scope require the corresponding engineering record.
Additional factory footage is kept separate from the Deye, Solis and Growatt manufacturer list records above. Each clip shows a particular setup or process; it is not a blanket compatibility or certification claim.
Selected footage of an inverter and wall-mounted batteries from the source-labelled GoodWe setup. Exact models, firmware and operating conditions require the corresponding record.
A separate factory setup showing stacked batteries, BMS display and an inverter. This footage does not extend the manufacturer approval lists shown above.
Selected Afore inverter and battery display footage. The clip documents a particular setup, not a pass report or approval for every Afore model.
Selected ATESS equipment, battery group and display footage. Check the exact configuration and engineering record before selection.
Multiple batteries and an inverter at a test bench. No aggregate power, energy, parallel limit or pass result is asserted from the footage.
A cabinet under water spray. This is a process excerpt, not an IP rating, lightning test, certification or proof for all cabinet models.
Provide the full battery and inverter model codes, quantities, and available firmware versions for review.
Our engineers test the battery and corresponding inverter before shipment.
Dispatch follows a passed pairing test. The installer must still verify the site design, local requirements and model-specific instructions.
03 / FAQ
It supports compatibility within the documented model and version scope. Other combinations need their own review; a brand name alone is not enough.
This page helps buyers assess EITAI products. Excerpts are clearly labelled as EITAI-prepared and retain source details and relevant conditions, rather than presenting an edited file as a complete original.
Battery model and quantity, exact inverter model, firmware versions if available, installation country, phase/voltage and project requirements. A qualified installer must check the final design.
LET’S CHECK YOUR COMBINATION