Find your energy solution

Search by product model, brand or keyword.

EITAI / BUYER GUIDANCE

How to check EITAI battery compatibility with Deye, Solis and Growatt inverters

An installer checklist for the exact inverter model, LV/HV architecture, firmware, electrical limits and CAN or RS485 commissioning evidence.

Reviewed 2026-11-12 · EITAI product and project records

A brand name is the start of a check

Deye, Solis and Growatt each offer different inverter families. Compatibility must be established for the full model code, regional version, battery configuration and firmware combination. A photograph of an installation with the same brand does not establish that another inverter will work. EITAI manufactures its batteries and can discuss inverter sourcing or distribution; the inverter brands retain their own product identities.

Send readable nameplate photographs and the inverter's hardware and firmware versions alongside the proposed EITAI battery model, BMS version, module count and wiring arrangement. For replacements, include the existing installation diagram and settings. For distributors, keep this configuration record with the quotation so a substituted model does not silently change the design.

Check the electrical architecture first

Separate low-voltage and high-voltage systems before comparing capacities. Check the complete battery operating voltage window against the inverter's battery input range, including the proposed series-module count. A module's nominal voltage is not necessarily the assembled system voltage. Then compare permitted charging and discharging currents, power limits and the required protection. An inverter without the relevant battery interface cannot be treated as a storage inverter.

CheckEvidence to request
LV or HV and voltage windowExact inverter and assembled battery datasheets
BMS communicationApproved protocol, pinout, cable and settings
Firmware combinationVersion-specific confirmation or commissioning record
Power and currentLimits for battery, inverter and installed protection

Confirm communication and demonstrate operation

CAN and RS485 describe communication interfaces, not universal battery languages. Confirm the required protocol selection on both devices, connector pinout, cable type, termination, addressing and master/slave settings from the applicable instructions. Similar-looking RJ45 sockets may have different pin assignments. Do not use an arbitrary network cable or copy another project's settings without checking.

During qualified commissioning, verify that the inverter receives plausible state of charge, voltage, temperature and charge/discharge limits from the BMS. Record versions and settings, test permitted charging and discharging, and confirm the documented response to communication loss and alarms. Use manufacturer procedures for fault checks. Obtain written confirmation for the exact configuration when an approved combination or firmware requirement remains unclear.

Use project records as bounded examples

The retained archive records Deye with ELEMAGIC in the Philippines, Solis with ET-76.8V314Ah-HV in Cambodia, and Growatt SPF5000es with ELEMAGIC in Ghana. These records show specific installations. They do not supply a universal compatibility list, complete firmware history or approval for every model sold under those brands. Use the linked examples to frame a technical discussion, then verify your own proposed equipment.

FAQ

Are all Deye, Solis or Growatt models compatible?

No blanket compatibility is claimed. Confirm the complete model, voltage architecture, firmware and EITAI battery configuration for each project.

Is a CAN or RS485 port enough to establish compatibility?

No. The protocol, pin assignment, cable, settings and firmware must also match, and BMS data and operating limits must be verified during commissioning.

What should I send for a compatibility review?

Send inverter and battery nameplates, exact model codes, firmware/BMS versions, module count, wiring diagram, intended power and destination grid requirements.

Related product and project records

Sources and scope

Discuss your model and project requirements