Find your energy solution

Search by product model, brand or keyword.

EITAI / GLOBAL ENERGY STORAGE TRENDS

Technical explainerPublished

Battery procurement explained: kWh, kW and documented inverter compatibility

A worked example shows why nominal energy alone cannot establish backup duration. A stronger request for quotation also defines output limits, operating assumptions and model-specific compatibility evidence.

Ask two capacity questions

The US Department of Energy distinguishes energy capacity, commonly expressed in kWh or MWh, from power capacity, expressed in kW or MW. Energy describes how much can be stored; power describes the rate at which it can be delivered. A buyer needs both. A battery with sufficient stored energy may still have an output limit below the simultaneous demand of the intended loads.

For a purchasing brief, describe the selected loads, the required operating period and any short-duration demand that the project engineer needs to assess. Then ask the supplier to identify the battery’s nominal energy, usable-energy conditions and continuous discharge capability, together with the proposed inverter’s relevant ratings. Keep the system boundary clear: battery-side figures and usable AC output are different reference points.

An illustrative calculation, with explicit assumptions

Consider a purely illustrative battery rated at a nominal 51.2 V and 200 Ah. Multiplying those values gives 10,240 Wh, or 10.24 kWh of nominal energy. Assume, for this example only, that 90% of nominal energy is available within the selected operating window and that conversion from the battery output to AC is 92% efficient. Estimated AC energy is 10.24 × 0.90 × 0.92 = 8.48 kWh.

At a constant 2 kW AC load, dividing 8.48 kWh by 2 kW gives approximately 4.24 hours. Every number here is an assumption for explaining the arithmetic, not an EITAI specification or a runtime guarantee. The example excludes auxiliary consumption and does not model temperature, ageing, changing load or varying efficiency. It also assumes that battery and inverter power limits can support the load throughout the period.

Treat communication as a documented system requirement

Matching nominal voltage does not by itself document a battery–inverter integration. Victron’s manufacturer documentation provides an example: its battery compatibility guidance links to specific battery information, while its DVCC manual describes systems that communicate battery charge-voltage, charge-current and discharge-current limits. The manual also identifies compatibility and firmware requirements. Those documents concern Victron systems; they are not evidence of compatibility for an unlisted EITAI combination.

For the actual proposed equipment, request the exact battery model, inverter model, communication protocol, required interface hardware, relevant firmware versions and written integration evidence. Ask who owns technical support if communication fails. A description such as CAN or RS485 identifies an interface family; procurement still needs the model-specific implementation and the manufacturer’s applicable requirements. The installer should work from the approved documentation for that system.

Make quotations comparable

Finally, request the evidence behind lifetime claims. Ask for the stated test conditions, the capacity-retention criterion and the written warranty terms, including any throughput or operating restrictions. Do not convert a headline cycle count directly into guaranteed years of service. Confirm whether monitoring, accessories, commissioning assistance and replacement logistics are included in the offer or priced separately.

A clear enquiry therefore combines the duty profile, required AC energy, required power, operating environment and proposed inverter with a request for supporting documents. That gives an installer, wholesaler or EPC a stronger basis for comparing suppliers. This evergreen explainer was prepared on 14 November 2026; it provides a procurement framework and an illustrative calculation, while site engineering and installation remain subject to qualified local assessment and applicable requirements.