Start with the circuits you need to support

A residential battery should be selected from measured demand and the customer's backup priorities. List essential circuits such as lighting, refrigeration, communications and selected sockets. Record their operating power, daily use and likely overlap. A household electricity bill helps estimate total consumption, but it does not show which appliances run together or how much electricity the backup circuits need during an outage.

Ask whether the goal is evening solar use, scheduled tariff shifting or outage support. Define a planning period and identify equipment that can be disconnected. Pumps, compressors and air conditioners need particular attention because their starting demand can exceed normal operating power. Where possible, use a meter or interval data rather than appliance labels alone.

Keep energy and power separate

Energy in kWh describes how much electricity is stored; power in kW describes the rate of delivery. EITAI's retained ELEMAGIC-10.2K-LV specifications list 10.24 kWh nominal energy and 9.22 kWh usable energy at 90% depth of discharge. They also list 4.1 kW rated DC power and 6.14 kW maximum DC power. These are battery-side values, not an AC backup output or a promised appliance runtime.

QuantityWhat to check
Usable kWhEnergy available within the specified discharge window
Continuous kWSimultaneous loads within battery and inverter limits
Starting demandSurge rating, duration and motor-start requirements

A hypothetical planning calculation

Suppose selected circuits average 0.8 kW over a six-hour planning period. Their hypothetical AC energy requirement is 0.8 × 6 = 4.8 kWh. If the designer assumes 90% DC-to-AC conversion efficiency for this example, the battery must supply approximately 4.8 ÷ 0.90 = 5.33 kWh. This efficiency assumption is illustrative; it is not a measured EITAI system result.

Compare that requirement with the intended operating window, additional reserve, temperature and expected ageing allowance. Do not apply a second 90% depth-of-discharge deduction to the stated 9.22 kWh usable figure. Next check the actual peak load, inverter backup rating, battery current limits and start-up behaviour. Passing an energy calculation alone does not establish suitability.

Send an installation brief before ordering

Send EITAI the load schedule, inverter's full model and firmware, destination, installation temperature range and expansion plan. Confirm the approved battery arrangement, protection, cable sizing and commissioning settings with qualified installers. In cold or hot locations, verify the selected model's charging and discharging limits separately. The final design should document assumptions and be checked on site before the customer relies on backup operation.

FAQ

Does a 10.24 kWh battery deliver 10.24 kWh to appliances?

Not necessarily. For ELEMAGIC-10.2K-LV, the retained specification states 9.22 kWh usable at 90% DoD. Conversion losses, reserve settings, temperature and operating conditions also affect AC energy delivered.

Can I size storage from the inverter's kW rating?

No. Use load energy and the planning period to assess kWh, then check simultaneous load and starting demand against both battery and inverter power limits.

Can batteries be added later?

Check the selected model's permitted arrangement and the inverter/BMS configuration before ordering. Expansion may require matching hardware, firmware, state of charge, protection and installation conditions.